Friday 8 May 2015

FINACLE HELPER V2.0 UPDATED VERSION FOR CBS OFFICES

Update Latest Version Of Finacle Helper V2.0

Pre-Requisite

  1. Install dot net framework 4.0.
  2. Install Access Runtime 
  3. Install all attached fonts from the below link

Finacle Helper V1.1 Installation

  • Install Finacle Helper v1.1 using Setup.
  • After Install Finacle v1.1 just upgrade to latest version of 2.0

New Features Added 

Fiancle_Helper_2.0_EXE
Replace this exe file in C:\Program Files\Finacle_Helper_1.0 folder 

Features of Update 2.0 of Fiancle Helper

  • CALCULATOR FOR SCSS QUARTER INTEREST
  • INTEREST DIFFERENCE IN FIRST QUARTER OF SCSS ACCOUNTS
  • PPF TRANSFER TO BANK
  • SCSS TDS REFUND PROCEDURE
  • DEATH CLAIM WHEN 1ST HOLDER DIES
  • HOW TO KNOW THE CY INTEREST OF SB/PPF ACCOUNT
  • PPF TRANSFER IN FROM BANK

RD Loan Error In Sanchay Post

RD Loan Error In Sanchay Post

While do the transaction of RD Loan in Sanchay Post module it may shows the error message as application terminated.
Error : Null object reference at line 39 in function f_validate_deposit_date of object f_validate_deposit_date.

Solution

  • Download attached postrd1.pbd file from PoTools.
  • Attached postrd1.pbd has to be copied in SP5\OT folder

Download

INTEREST RATE CHANGE TOOL 2015 FOR SCS AND SSA

Interest Rate Change Tool 2015

For SSA & SCS wef 01-04-2015

Steps To Update 

  1. Close/Exit all screens in Sanchay Post application in all systems.  Make sure that application is not running in any of the system.
  2. Double Click on ‘Upgrade_intrate_2015.exe’ file. Provide the server name and click on ‘Upgrade Interest Rates’
Note:The exe ‘Upgrade_intrate_2015.exe’ and sp.pbd should be placed in the same folder. This needs to be executed in server machine alone.
The User messages are displayed in the text area. Once the update is completed exit button will be enabled.
  • Click on Exit. The tool will be closed.
  • If the update is not successful, ‘Restore to previous version’ will be enabled.
  • While clicking on ‘Restore to Previous Version’, the tables will be restored to previous interest rates.

Download

DATA PROFILING TOOL V6.4 DATED 29.04.2015


Data Profiling Tool V6.4

Download latest DPT v6.4 for clear database discrepancies which was released on 29.04.2015 by DMCC Chennai.

Download

SSA ACCOUNT EXPORT IMPORT UTILITY FOR SANCHAY POST 7.5

Export Import Utility For Sanchay Post 7.5

Pre-Requisite :
The following are prerequisite for Using this Export Import Utility for Sanchay post 7.5:

  1. The Sanchay Post version 7.5 should be successfully installed. 
  2. Upgrade Database should be successfully completed. 
  3. Patches 1 and 2 can be optionally installed. 
  4. Interest Rate Upgrade should be successfully completed.
  5. Service pack 1 for Sanchay post 7.5 should be successfully installed. 
  6. Upgrade for PPF and RD should be successfully completed. 
  7. Patch 5 for Sanchay post 7.5 should be successfully installed.
  8. Patch 6 for Sanchay post 7.5 can be optionally installed.
  9. Patch 7 for Sanchay post 7.5 can be optionally installed.
  10. Patch 8 or Patch8.1 for Sanchay post 7.5 can be optionally installed.
  11. Patch 10 for Sanchay post 7.5 should be installed.
  12. Patch 10.1 for Sanchay post 7.5 should be installed.
  13. Patch 11 for Sanchay post 7.5 should be installed.
  14. Patch 12 for Sanchay post 7.5 should be installed.
  15. Patch 13 for Sanchay post 7.5 should be installed.
  16. Sanchay Post version 7.0 should not be available in the system.

The database version should be updated with all patches provided. The database should be compliant with SQL Server 2000 / 2005 /2008.

Tool Description

soexport.exe – This should be executed in SO for exporting SSA related data in tables dcl.ssa_indexreg, dcl.ssa_ledger, dcl.ssa_dd_details and dcl.bo_details (for scheme SSA). 6 files will be generated at each SO.

hoimport.exe – This should be executed in HO. User should copy the 6 files generated at SO. On executing this data exported will get copied to respective SO database in HO.

Read Me Document : Download

Download Patch For SSA Import And Export : Download

Up-gradation of three posts of Private Secretary to the post of Sr. Private Secretary in three Postal Circles i.e Chhattisgarh, Jharkhand and Uttrakhand one post in each Postal Circle

Details of meeting with MoC held at Sanchar Bhawan on 05.05.2015

Details of meeting held at Sanchar Bhawan on 05.05.2015 at 1300 hrs with Hon’Minister of Communications by Secretary Generals of NFPE & FNPO on behalf of Postal Joint Council of Action.

In continuation of the meeting by PJCA leaders consisting all General Secretaries and Secretary Generals of both Federations ( NFPE &FNPO) held with Chairman Postal Services Board , Member(HRD), Member (O), Member(Tech) & other higher officers of Postal Directorate on 30.04.2015 at 1100 hrs on all the 26 Charter of demands, the PJCA had decided to insist a further meeting with Hon’ Minister of Communications in respect of the following three Major sectional demands pertaining to the Postal fraternity.

1. Corporatisation and Privatisation of Postal Department as recommended by the TASK FORCE committee.
2. Inclusion of Gramin Dak Sevaks (GDS) in the terms of reference of 7th Central Pay Commission. Grant of Civil servant status to GDS and grant of all benefits of departmental employees on pro-rata basis without any discrimination.
3. Implementation of Cadre Restructuring in Postal, RMS, MMS and Postal Accounts as per the proposal signed with the JCM (DC) staff side.
The ground was under active preparation for indefinite strike w.e.f .06.05.2015.
Secretary Generals of NFPE & FNPO on behalf of Postal Joint Council of Action were invited for meeting with Hon’Minister of Communications.
On 05.05.2015.at 1300 hrs both Secretary Generals met the Hon’ MoC and submitted a memorandum on GDS issues primarily for inclusion of GDS under the purview of 7th Central Pay Commission. As the Department of Posts assured the PJCA on 30.04.2015 that the proposal will be strongly recommended and referred to D/o Expenditure for reconsideration, the Hon’ MoC was requested to offer his good offices.
Hon’Minister of Communications has assured that the GDS issues would be looked into with an open mind and he would try to his best.
The Cadre Restructuring Proposal file is awaiting for the approval of Hon’ MoC and now even though he had some reservations, he agreed to pass it with positive recommendations. The Cadre Restructuring Proposal will shortly be forwarded to DoPT.
In respect of Task Force Committee recommendations, Hon’ MoC has not given any assurance about future course of action. But he asserted that NO PRIVATISATION at present and there will be no reduction or structural change in the department.
The meeting with Hon’ MoC is hopeful.

Considering the reply given in the minutes by the Postal Directorate and assurance given by Hon’ MoC , the PJCA has decided to defer the proposed INDEFINITE STRIKE from 06.05.2015 .

Source : http://nfpe.blogspot.in/

IP Exam - 2014 Result declared for various Circles